About naue_adm_web

This author has not yet filled in any details.
So far naue_adm_web has created 8 blog entries.

Combigrid® – Base course reinforcement – Haul Road for Blenheim Lake Restoration – UK

Originally constructed to traverse a wide marshy valley on the approach to Blenheim Palace, Vanbrugh’s 'Grand Bridge' now spans Capability Brown’s 47-hectare water feature, and the stretch of ...

Combigrid® – Base course reinforcement – Haul Road for Blenheim Lake Restoration – UK2023-07-20T06:37:03+00:00

Secugrid® – Rhigos Electricity Substation – UK

At the 7.8 hectare site located on the Hirwaun Industrial Estate, the construction of a 400kV substation was required to connect a new 76 turbine, 228MW wind farm development to the National Grid. The wind farm, approximately 4km to the south at Pen-y-Cymoedd, will be the largest onshore wind farm in England and Wales when it enters operation.

Secugrid® – Rhigos Electricity Substation – UK2023-05-25T11:22:01+00:00

Bentofix® X – Test CS

Meizhou City, now known as Meishan City, is a prefectural-level municipality in the Sichuan Province, China. More than 3 million inhabitants are registered in this city. Morphologically, the town is located south-west of the Sichuan Basin, a lowland region surrounded by mountains and drained by the Yangtze River.

Bentofix® X – Test CS2023-06-26T12:55:43+00:00
Go to Top