Geogrid-powered stability for Thurrock energy

The Thurrock Flexible Generation project includes Thurrock Storage, a 300 MW (600 MWh) battery energy storage system, and Thurrock Power, a 450 MW power plant. Together, they provide rapid on-demand electricity to stabilise the National Grid during peak demand or renewable energy shortfalls.

White Combigrid® is laid in a trench beneath power lines.
White Combigrid® is laid in a trench beneath power lines.
Installed Combigrid® over the entire length
Installed Combigrid® over the entire length

Project background

The Thurrock Flexible Generation project, located north of Tilbury substation, comprises Thurrock Storage, a 300MW (600MWh) battery energy storage system (BESS), and Thurrock Power, a 450MW power generation facility. The BESS supplies on-demand electricity to the National Grid, while multiple gas-fired reciprocating engine banks can generate power within 10 minutes. This ensures network stability during renewable energy shortfalls or peak demand.

An excavator spreads gravel over white Combigrid® on a construction site.
An excavator spreads gravel over white Combigrid® on a construction site.
Installation of base course material
Installation of base course material

Tackling challenging conditions

The site, originally a tidal saltmarsh, now exhibits complex ground conditions. To ensure stable access roads and crane platforms, geogrid reinforcement was specified. Based on prior successful collaborations with Naue, Jones Bros Civil Engineering chose Naue Combigrid® and Secugrid® for the project.

“Poor weather in early development made things more difficult,” explained Jake White, Naue’s Sales Manager for southern England and Wales. “CBR values were lower than expected, requiring floating road construction. Relying solely on imported fill would have drastically increased aggregate thickness – adding costs, labour, transport demand and construction time.”

Naue’s geosynthetic solution

Naue Combigrid® was laid directly on the subgrade, offering separation, filtration, stabilisation and reinforcement. Where higher strength was needed, additional layers of Naue Secugrid® were used between aggregates. In total, over 70,000 m² of Combigrid® and nearly 50,000 m² of Secugrid® were supplied. Lightweight and easy to handle, the products offer fast installation with simple overlaps and trimming. The grid aperture interlocks with granular fill, and friction between fill and the textured Secugrid® bars ensures excellent bond and structural integrity.

To manage stormwater, a surface water attenuation pond was built. Naue’s Bentofix® geosynthetic clay liner (GCL) was selected for sealing. Bentofix® is a needle-punched composite with a high-swelling sodium bentonite core between two geotextile layers. It is placed directly on the prepared base, and its self-sealing edges – impregnated with dry bentonite – create tight, secure overlaps. The sodium bentonite forms an immediate hydraulic barrier when in contact with water. For irregular shapes, Bentofix® is also available with fully bentonite-impregnated cover geotextile to allow self-sealing overlaps even on cut-to-size panels to avoid manual reworking.

Around 7,000 m² of Bentofix® was installed. Compared to traditional thick clay linings, Bentofix® requires far fewer deliveries and generates cost savings.

Project goals achieved

In summary, Jake White stated: “Naue’s geosynthetics helped the project meet its construction goals.”

Project benefits

  • Strong road

    Stable roads and platforms on weak subgrade

    Combigrid® and Secugrid® provided the reinforcement needed for reliable access roads and crane platforms.

  • Costs

    Less aggregate and faster construction

    The geosynthetic solution reduced fill thickness, vehicle movements, installation time and overall costs.

  • Safety

    Secure and efficient pond sealing

    Bentofix® created an immediate hydraulic barrier with self-sealing overlaps and required far fewer deliveries than a thick clay lining.

Project information

  • Project name
    Thurrock Flexible Generation, Tilbury, UK
  • Client
    Statera Energy, UK
  • Designer / consultant
    GGP Consult, UK
  • Contractor
    Jones Bros. Civil Engineering, UK
  • Products
    Combigrid® 60/60 Q1 GRK 4 C
    Secugrid® 40/40 Q1
    Bentofix® NSP 4900