Hamilton Transit Facility in Ontario, Canada
Southwestern Ontario is known for its clay soil with high moisture content and poor drainage. Melting frost and ice plus spring rain contributed to a relatively high water table 2m below ground. The challenge was to build a paved access road over waterlogged ground, with a minimum 15-year design life.
Wind farm floating access road design and construction, UK
Windy Standard III is part of the Windy Standard Wind Farm in Carsphairn Forest, Dumfries & Galloway, Scotland, which has been in operation for 25 years. Before groundworks could begin, 10km of new access roads had to be built and existing routes upgraded, including approx. 2km of floating access road.
Secudrain® drainage system ensures reliable sports performance
A new artificial grass football field was constructed in Navarra, Spain, installed over the existing natural soil. To support year-round sports activities and maintain optimal playing conditions, an efficient and durable subsurface drainage concept was required.
Secugrid® HS: Transferul încărcărilor pe piloți cu incluziune rigidă, Marea Britanie
Modernizarea unui coridor strategic din Marea Britanie printr-o soluție durabilă - Condițiile dificile ale terenului au impus un sistem de fundație stabil.
Combigrid® – Construcția unui drum forestier „plutitor”, Marea Britanie
În nordul dealurilor Ochil din Scoția, a fost creată o nouă rețea de acces forestier peste terenuri de turbă extrem de slabe, folosind Combigrid® de la Naue, fără excavare și fără impact negativ asupra mediului. Această soluție de drum „plutitor” permite acces forestier pe termen lung, protejând în același timp una dintre cele mai sensibile rezerve de carbon ale țării.
Stabilizare și armare platformă de lucru pentru macara – Fry’s Corner, Canada
Utilizarea geogrilelor Combigrid® împreună cu proiectarea prin Naue Portal/Platform a permis realizarea unei platforme de lucru sigure și eficiente pe terenuri dificile, saturate cu apă.
Secugrid® – susține funcționarea celui mai solicitat coridor de transport din Malaezia
În colaborare cu Naue, Alpha Pinnacle a propus o fundație din pământ armat (RSF) folosind geogrila Secugrid® 40/40 Q1.
Stabilitate bazată pe geogrilă pentru Thurrock Energy
Amplasamentul, situat într-o zonă inundabilă în timpul mareelor, este caracterizat de condiții complexe de teren. Pentru a asigura stabilitatea drumurilor de acces și a platformelor pentru macarale, a fost necesară armarea cu geogrilă. În lumina unor colaborări anterioare de succes cu Naue, Jones Bros Civil Engineering a ales pentru acest proiect Combigrid® și Secugrid®.
Load transfer platforms over piles – geogrids for load-bearing solutions
As part of urban and port development in Bremerhaven, the New Harbour Lock – connecting the Weser River and Neuer Hafen – was constructed between 2003 and 2005. The project also included a road ramp over the outer lock head, directly adjacent to the historic Loschenturm lighthouse.
Smart from the ground up – Geosynthetics for energy & water control
From slope reinforcement to hydraulic sealing, Naue’s geosynthetic systems delivered a high-performance, sustainable foundation for this next-generation battery storage facility.
Roadworks to open up the construction site for the replacement of a railway power line
As part of the replacement of 110 kV railway power line between Bingen and Koblenz, continuous access to the individual pylon sites had to be created. This required unpaved roads over which heavy construction vehicles such as concrete mixers, mobile cranes and material transporters could travel safely.
HafenCity Hamburg – Fundații stabile chiar și pe terenuri slabe
După darea în exploatare, în 2019, aproximativ 67.000 de vehicule au folosit zilnic noul traseu. Zona critică de tranziție dintre pod și rambleu este menținută funcțională datorită sistemului de fundare descris mai sus. Acest proiect demostrează că geosinteticele și tehnologiile inovatoare de fundare conlucrează eficient pentru crearea unor structuri cu performanțe ridicate.