Smart from the ground up - geosynthetics for energy and water control

At Uskmouth Power Station in South Wales, a 230 MW battery energy storage facility required a reinforced platform, erosion protection and water containment. Naue geosynthetics were used for slope reinforcement, firewater containment and stormwater pond sealing.

Bentofix® being installed on a construction site using an excavator.
Bentofix® being installed on a construction site using an excavator.
Installation of Bentofix® NSP 5300
Installation of Bentofix® NSP 5300

From former coal power station to 230 MW battery energy storage facility

In the transition to renewable energy, battery storage systems are key to balancing supply fluctuations. In Newport, South Wales, a brownfield site - once home to two coal-fired power stations - is being redeveloped into an energy storage site. At the former coal yard of Uskmouth B, decommissioned in 2017, Uskmouth Energy Storage Ltd is developing a 230MW battery energy storage system (BESS). The facility will utilise over 100 battery units to provide essential grid-balancing services by storing excess renewable power and discharging it during peak demand.

Large construction area lined with Carbofol® and Secutex®.
Large construction area lined with Carbofol® and Secutex®.
Installation of impermeable isolatable cells with Carbofol® and Secutex®
Installation of impermeable isolatable cells with Carbofol® and Secutex®

Tidal flood risk, steep slopes and demanding ground conditions

Located near the River Usk estuary, the site is exposed to tidal flood risk. To protect the battery units, ground levels needed to be raised significantly. The project also demanded stormwater management and ecological design, including the construction of a retention pond. Burroughs engineers called for a robust foundation platform to withstand loading from heavy equipment and the battery containers, as well as steep slope reinforcement in space-constrained areas. Emergency runoff containment was another requirement, along with a durable lining solution for the new pond.

Secugrid®, Secumat®, Carbofol® and Bentofix® for reinforcement and containment

To raise the platform by approximately 2m, a well-graded Class 1A aggregate was placed over a cut-and-filled base. Naue’s Secugrid® 40/40 Q6 reinforced the platform edges, especially where 1:1 slope steepness was required. Around 8,000m² of this PET geogrid was installed. Secugrid® is known for its high stiffness, low creep, and effective force transfer through interlock and friction - contributing to platform stability for the battery storage facility.

To prevent erosion on steep slopes, over 1,000m² of Secumat® 401 G4 was installed. This UV-stabilised erosion control mat combines a structured, root-permeable matrix with a stabilising underside, designed for erosion control on vegetated slopes.

For firewater containment, impermeable isolatable cells were constructed within the platform using over 20,000m² of Carbofol® 1mm HDPE-geomembrane, protected above and below by Secutex® R401 and R301 PP-nonwoven geotextiles. Naue Carbofol® provides excellent chemical resistance and weldability, while Secutex® safeguards against puncture and installation damage.

The nearby stormwater retention pond was lined with Bentofix® NSP 5300, a geosynthetic clay liner (GCL) combining geotextiles and high-swelling sodium bentonite. Covering around 4,000m², the liner was used to form a low-permeability lining system with minimal thickness, avoiding the need for clay sourcing. The geosynthetic clay liner provided a compact sealing solution without requiring a conventional mineral clay sealing layer. The pond was also designed with habitat requirements for water voles in mind.

Geosynthetic reinforcement, erosion protection and sealing systems at Uskmouth

From slope reinforcement to hydraulic sealing, Naue geosynthetics were used to reinforce the raised platform, protect embankments against erosion and provide containment and sealing functions for the battery storage facility. Jake White, Sales Manager for Southern England & Wales at Naue, summarised: “Naue’s geosynthetic solutions helped address the project’s requirements for platform reinforcement, erosion control and water containment within a challenging brownfield site.”

Project benefits

  • Base course stabilisation

    Platform stability

    Secugrid® geogrids reinforce the raised foundation platform and support load transfer, even on steep 1:1 slopes.

  • Erosion control reinforced embankment mesh

    Effective erosion control

    Secumat® erosion control mats protect steep embankments against surface erosion while supporting vegetation growth.

  • Ponds reservoir

    Efficient pond sealing

    Bentofix® geosynthetic clay liners provide a thin, low-permeability sealing layer for the stormwater retention pond without requiring a conventional mineral clay sealing layer.

Project information

  • Project name
    Uskmouth Power Station, South Wales, UK
  • Client
    Uskmouth Energy Storage Ltd, UK
  • Designer / consultant
    Alistair Burroughs Design Partnership Ltd, UK
  • Contractor
    Jones Bros Civil Engineering UK
  • Products
    Secugrid® 40/40 Q6
    Secumat® 401 G4
    Bentofix® NSP 5300
    Carbofol® 1mm
    Secutex® R 301
    Secutex® R 401

No. 01097