Seabed scour protection at Southampton Cruise Terminal

At the City Cruise Terminal (Berth 101) in Southampton, UK, bow-thruster currents had created two seabed scour holes. In 2012, 1,160 Naue Secutex® Soft Rock geotextile sand containers were installed to fill the voids and provide local scour protection without rock armour.

A mechanical grab lifts a large white object from the water beside a boat, where a worker in orange waterproof clothing handles a yellow rope.
A mechanical grab lifts a large white object from the water beside a boat, where a worker in orange waterproof clothing handles a yellow rope.
Crane installation of a Naue Secutex® Soft Rock sand container at Southampton Port
Crane installation of a Naue Secutex® Soft Rock sand container at Southampton Port

Seabed scour at Southampton's Berth 101

At ABP Port of Southampton’s City Cruise Terminal, Naue geotextile sand containers have been installed to remediate scour holes in the harbour bottom and provide local scour protection.

Southampton is the cruise capital of the UK, with over 430 cruise calls departing from the port each year. The port is one of the busiest deep-water ports in the UK and can accommodate any size of cruise ship. The port is also home to the UK’s second largest container terminal.

The City Cruise Terminal (Berth 101) in the Western Docks is one of four cruise ship terminals at the port and is predominantly used by ‘Royal Caribbean International’ cruise ships. The 370-metre-long berth accommodates some of the world’s largest liners such as 'The Independence of the Seas’; at 333 metres long with 15 decks and the capacity for 4370 passengers, it is the largest class of ship to operate out of a UK Port.

Large white sandbags secured with blue ropes stacked beside an orange crane at the water’s edge.
Large white sandbags secured with blue ropes stacked beside an orange crane at the water’s edge.
Naue Secutex® Soft Rock sand containers prepared for installation at Southampton Port
Naue Secutex® Soft Rock sand containers prepared for installation at Southampton Port

Scour caused by cruise ship bow thrusters

When manoeuvring alongside berths, cruise ships use powerful bow thrusters which generate a huge amount of turbulence in the water and a high flow velocity, which can lead to localised scour problems at the harbour bottom. Routine bathymetric surveying carried out by the port authority had identified the presence of scour holes at both the eastern and western end of berth 101. The situation was monitored on an on-going basis and following further detailed surveys it was decided to carry out remedial work to fill a 650m3 void at the eastern side and a 350m3 void at the west.

The challenge for ABP’s engineers was how to fill the voids economically in terms of cost and speed, with a material strong enough to absorb the propeller energy of the thrusters and provide local scour protection.

1,160 Naue Secutex® Soft Rock sand containers for use in Southampton

Naue put forward a geosynthetic solution that involved the supply of approximately a thousand Secutex® Soft Rock sand containers. Each sand container measures 1.45m x 2.38m when flat and contains 1m3 of sand, weighing 1.7 tonnes. Due to the high elongation capability, needle-punched Secutex® nonwoven geotextiles can handle the critical stress within the material and at the seams.

Naue Secutex® Soft Rock sand containers were chosen for two reasons. The sand containers were selected as an alternative to conventional rock armour for this project. The geotextile sand containers combine filtration and ballast functions in a single system; hard rock armour reflects the wave energy into the host sediment, reducing its shear stress. The reduction of shear stress combined with the high density of the rock leads to the rock sinking through the sediment. The containers distribute their load across the seabed and provide ballast and filtration functions.

Scour remediation without diver placement

Raymond Brown Construction Ltd was appointed to carry out the works, which included off-site filling of the Secutex® Soft Rock sand containers with correctly graded sand supplied by Raymond Brown Minerals and then triple stitching the containers ready for placement. Using a plumbine, the varying depths of the voids were charted on a 1-metre grid drawing so that the sand containers could be placed in known positions without the need for divers. Employing a 35-tonne crane fitted with a specially adapted grab, each sand container was lowered 22 metres to the seabed from the quay wall. The remedial works caused no disruption to normal port activity; installation work was temporarily halted when cruise ships were in port.

Filling two seabed scour holes

In total, 1,160 Naue Secutex® Soft Rock sand containers were placed into the two voids alongside the quay wall, providing localised seabed scour remediation using geotextile sand containers without rock armour which is both costly and difficult to handle on site.

Project benefits

  • Costs

    Cost-efficient alternative

    Geotextile sand containers offered an alternative to conventional rock armour, avoiding the transport of heavy rock materials.

  • Easy installation

    Efficient installation

    Crane-assisted placement at depths of up to 22 m eliminated the need for divers.

  • Adapte to subsoil

    Flexible and robust

    High-elongation Secutex® nonwoven geotextiles accommodate stresses within the material and seams.

  • Scour protection

    Effective scour protection

    Combined filtration and ballast functions help retain seabed sediments and reduce further erosion.

Project information

  • Project name
    Port of Southampton Scour Protection, UK
  • Year constructed
    August 2012
  • Client/Project manager
    Associated British Ports (ABP)
  • Main contractor
    Raymond Brown Construction Ltd.
  • Product
    Secutex® Soft Rock sand containers

No. 00515