Home » Videos » Soil reinforcment over mining regionCivil engineering with Secugrid®Poland: New construction of the A1 motorway from the Czech Republic to the east coast. Sinkholes threaten the entire region. A total of 1.4 million m2 of Secugrid® was installed as ground reinforcement.