Windenergietage 2026
Explore geosynthetic solutions for wind farm access roads, crane setup areas and ground stabilisation. Meet Naue at Windenergietage 2026 in Linstow.

Detailed information
From 10 to 12 November 2026, the 34th Windenergietage will bring the wind energy industry together at the Van der Valk Resort Linstow in Linstow, Germany, under the motto “Many questions – few answers.” The conference with accompanying exhibition provides a platform for exchanging expertise and connecting with specialists. Its programme covers topics such as EEG 2027, grid connection, hybrid parks and storage, repowering, operations and maintenance, and foundations and logistics in complex terrain.
Naue is part of the programme: on 12 November 2026 (11:00–11:30, Forum 19), Ralph Werner will present solutions from design to installation of modern geosynthetics for construction on difficult ground. You are welcome to arrange a meeting with our specialists to discuss project-specific requirements for access roads, crane setup areas, working platforms and ground stabilisation, particularly on weak subgrades.
| Event: | 34. Windenergietage 2026 |
|---|---|
| Date: | 10. – 12. November 2026 |
| Venue: | Van der Valk Resort Linstow |
| Address: | Krakower Chaussee 1, 18292 Linstow, Germany |
| Hall and stand: | Stand: 78 |
| Languages at the Naue stand: | English and German |
Why visit Naue at Windenergietage?
- Build access roads on weak subgrades - Explore geogrids such as Secugrid® and Combigrid® that stabilise soil, optimise base courses and support roads and working platforms. Combigrid® combines four functions in a single step.
- Design crane setup areas and working platforms - Discuss geosynthetic systems for crane setup areas and working platforms with high load requirements. These solutions can improve soil stability and bearing capacity.
- Control water and keep layers separated - Talk about Secutex® geotextiles for separation and filtration and Secudrain® drainage composites for water management in roads and platforms. These systems can help prevent soil loss and support long-term stability.
- Upgrade existing infrastructure for repowering - Explore whether existing access roads and crane setup areas can be adapted to higher load requirements. Our team will help you identify suitable systems for the specific ground conditions of your site.
Naue focus at Windenergietage 2026
- Access roads and stable subgrades
- Crane setup areas and working platforms
- Soil reinforcement and subgrade stabilisation
- Separation, filtration and drainage
- Erosion control on embankments
- Project-specific engineering and installation support
Explore wind energy solutions with Naue
- Reinforced access roads for heavy transport and construction vehicles
- Stable crane hardstandings and working platforms
- Ground improvement solutions for weak and variable subgrades
- Optimised aggregate use through geosynthetic reinforcement
- Design calculations and material selection for wind farm infrastructure
Who should meet us?
The Naue stand is relevant for
- Wind farm developers and project owners
- Civil and geotechnical engineers
- Engineering consultants and infrastructure planners
- EPC contractors and construction companies
- Wind turbine installation and logistics specialists
- Renewable energy infrastructure professionals

Arrange a project consultation
A pre-arranged meeting allows us to connect you with the appropriate specialist and prepare for your technical questions. You are welcome to share the application, project phase, site conditions or specification topic in advance