Case studies Infrastructure2025-08-07T11:53:20+00:00

Geogrid-Powered Stability for Thurrock Energy

The site, originally a tidal saltmarsh, now exhibits complex ground conditions. To ensure stable access roads and crane platforms, geogrid reinforcement was specified. Based on prior successful collaborations with Naue, Jones Bros Civil Engineering chose Naue Combigrid® and Secugrid® for the project.

November 6, 2025|

Gigafactory UK – Smarter Platform Design with the Naue Platform Calculator

The Naue Portal offers a powerful digital toolkit designed to support engineers and contractors in creating smarter, faster and more sustainable geotechnical designs. One of the powerful digital tools is the Naue Platform Calculator intended to design temporary working platforms on weak, cohesive subgrades. Naue Platform follows the general design principles of the BR470 design guideline (Working platforms for tracked plant).

August 13, 2025|

HafenCity Hamburg – Safe foundations despite soft ground

After commissioning in 2019, around 67,000 vehicles have used the new route every day. The particularly critical transition area between the bridge and embankment will remain serviceable in the long term thanks to the optimised and consistently planned system. A project that shows how geosynthetics and innovative foundation technologies can work together to create high-performance infrastructures.

June 11, 2025|

Haul roads & compounds for solar park, UK

As there's no shortage of space at Higher Stockbridge, all vehicles and equipment will be stationed on-site throughout the construction period, and rather than installing temporary haul routes across the site during the construction period, it was proposed that permanent access tracks were completed during the initial stages of construction.

February 19, 2025|
Go to Top