Efficient Drainage Solutions for Backfilled Areas in Railway Construction

In railway construction, effective drainage of backfilled areas is essential to prevent water accumulation and maintain structural integrity. Naue’s Secudrain® geosynthetic drainage systems are designed to collect and safely discharge percolation water, reducing hydrostatic pressure on structures such as bridge abutments and retaining walls. Secudrain® consists of a robust, three-dimensional, wave-structured polypropylene drainage core, combined with one or more Secutex® nonwoven geotextiles that serve as separation and filtration layers. This design ensures high water discharge capacity and long-term performance, effectively safeguarding the stability of railway infrastructure

Geosynthetic drainage system
Secudrain® 131 C WD 401 131 C

Geosynthetic drainage system for drainage of bridge abutments. Collection and safe discharge of seepage water.

Functions:

  • Separation
  • Filtration
  • Drainage

Advantages:

  • Replaces natural drainage aggregate
  • Use of filterstable Secutex® nonwoven geotextile filter
  • Long-term hydraulic performance of Secudrain® drainage system
Loading...