| Typical location | Embankment and cut slopes, irregular earthwork surfaces | Edge zones, planar areas, high hydraulic head | Karst terrain, particularly sensitive water protection zones |
| Sealing principle | Swelling sodium bentonite; self-sealing longitudinal overlaps | Welded 2.0 mm HDPE, textured on both faces | GCL and geomembrane as dual barrier |
| Key value | k10 = 1.2 × 10⁻¹¹ m/s (EN 16416) | Testable welded seams; resistant to hydrocarbons, de-icing salts and heavy metals | Combination of both sealing principles |
| Installation | Unroll, min. 300 mm overlap, no welding; min. 300 mm cover soil | Welding to DVS 2225-4; seam testing by air pressure or vacuum; cover soil as per design | As per ZiE design |
| Protection layer | Secutex® R 901 DB above and below | Secutex® R 901 DB above and below | Secutex® R 901 DB above and below |
| DB approval | HPQ case 3.11 + case 3.13 | HPQ case 3.12 + case 3.13 | ZiE (EBA) + HPQ cases 3.11, 3.12, 3.13 |
| Criterion | GCL system | Geomembrane system | Composite system |
| Recommended products | Bentofix® NSP 5400 DB, Secutex® R 901 DB | Carbofol® HDPE 406 2.0 F/F DB, Secutex® R 901 DB | Bentofix® NSP 5400 DB, Carbofol® HDPE 406 2.0 F/F DB, Secutex® R 901 DB |