Regulatory compliance without compromise
Carbofol® and Bentofix® products meet European and international standards, including Eurocode 7, EN 13257 (geotextiles for solid waste), EN 13493:2005+A1:2016 (geomembranes for solid waste), GRI GM-13 and German BAM/LAGA (DepV) requirements. Full slope stability analysis and shear box testing are available. This ensures permit-ready designs from the outset.
Lower whole-life cost for the landfill operator
Geosynthetic capping systems avoid the cost of importing large volumes of compacted clay. They shorten the construction programme. Material savings of up to 40% compared with conventional clay capping are achievable on suitable sites.
Faster and simpler installation for the site team
Carbofol® rolls are supplied in widths of up to 7.5 m for rapid deployment. Bentofix® GCL panels require no specialist welding equipment. Secudrain® geocomposites are thermally bonded and ready to install.
Single-source supply with engineering backup
Naue provides design support, product supply and installation guidance from a single source. This reduces interfaces between suppliers and simplifies project management.